INVESTMENT PIPELINE

INVESTORS PROJECTS

CONSTRUCTION A NEW LINE WITH STANDARD SPACING DAKAR - KIDIRA

Estimated Cost

$2.71 BILLION

Project overview

This project involves the construction of a new standard gauge railway line (1435mm) from Dakar to Tambacounda, 464 km away, including: 2 services: Diourbel - Touba over 45 km and Guinguinéo - Kaolack over 25 km, 2 port sidings: Bargny over 6 km and Ndayane over 20 km from the main line. A total of around 600 km of track. Intermediate phase: Operation of the existing metre gauge line.

Project Sponsor

MITTA

Location

Regions of Dakar and Tambacounda

Implementation Timeline

2025-2029

Objectives and Expected Outcomes

  • Improving the mass transport offer for more efficient and sustainable logistics chains, including between future economic hubs
  • Opening up several localities: 7 regions of Senegal served, including religious capitals (the TER will thus be able to use the same infrastructure and leave Dakar to reach the regions)
  • Rail transport capacity >20 million tonnes/year
  • Reduce the number of accidents on the roads
  • Limit premature deterioration of roads
  • Job creation: more than 20,000 during the construction phase and more than 2,000 during operation.

Component(s)

  • Rehabilitation of the Dakar-Tambacounda-Kidira-Bamako line
  • Acquisition of modern trains
  • Logistics hub: Tamba
  • Maritime hub: Dakar, Ndayane, Bargny-Sendou
  • Agro-industrial hub: Kaolack
  • Redistribution centre to the south
  • Refrigerated platform: Thiès
  • Modernisation of access and logistics facilities at the Dakar Autonomous Port

Investment Opportunities

  • 2.8 MT trade between Mali and Senegal
  • 4.8 MT trade from Mali

Financing Structure

  • Project finance: creation of a railway SPV
  • EPC+F for 25-35 years
  • Investment by strategic railway or logistics operators

Institutional Partners

  • MITTA
  • Les Grands Trains du Sénégal
  • APIX

Project Status

  • Mobilising resources